Half Bathroom Day 5: FInish piping and flue

February 17, 2010

The bathroom is taking longer than we anticipated, but it's moving along. Today the plumber and his assistant finished the piping for the water lines, the flue to the roof and the drywall.


Finishing the piping.


He finished drywall and spackling


The roof.


Basil checkin' things out. He's so nosy.

Keith has to move an electrical outlet and he's going to install the bead board. Then the plumber and his assistant are going to finish up by installing the toilet and sink cabinet tomorrow. I can't wait to see it all complete!