New-Wrap insulation around ducts in basement ceiling.
FALL ‘08
Things to Do Soon
- Put up Christmas lights around outside of house.
- Install gutter guards.
- Buy new dryer (ours is on it’s way out)
Living Room
- Staple molding around room and get corner molding. (Not a priority)
- Tape South window (it’s sagging and drafty).
Yard
- Patio with pavers under BBQ grill- (Spring ’09)
- Mulch around house throughout fall.
WINTER ‘08
Kitchen
- Install cabinets on refrigerator side.
- Install dishwasher.
- Install cabinets on sink side.
- Cut existing counter top.
- Do floor tiles.
- Give kitchen second coat of paint.
½ Bathroom
- Spackle, sand and paint. (Working on spackle now.)
- Staple molding
- Toilet - Getting an estimate for installation soon.
- Do floor tiles - $60
- Paint and Install door (in attic)
- Replace light and cover.