To-Do list Update

January 2, 2009

We've really cut down our To-Do List!

New-
Wrap insulation around ducts in basement ceiling.

FALL ‘08

Things to Do Soon
  • Put up Christmas lights around outside of house.
  • Install gutter guards.
  • Buy new dryer (ours is on it’s way out)

Living Room

  • Staple molding around room and get corner molding. (Not a priority)
  • Tape South window (it’s sagging and drafty).

Yard

  • Patio with pavers under BBQ grill- (Spring ’09)
  • Mulch around house throughout fall.

WINTER ‘08
Kitchen

  • Install cabinets on refrigerator side.
  • Install dishwasher.
  • Install cabinets on sink side.
  • Cut existing counter top.
  • Do floor tiles.
  • Give kitchen second coat of paint.

½ Bathroom

  • Spackle, sand and paint. (Working on spackle now.)
  • Staple molding
  • Toilet - Getting an estimate for installation soon.
  • Do floor tiles - $60
  • Paint and Install door (in attic)
  • Replace light and cover.